B0729/25
Checking status...
Construction Activity

Work in progress area for unloading of equipment at RPLL.

2025-02-25 08:51 - 2025-05-31 23:59

Period of Applicability

2025-02-25 08:51 - 2025-05-31 23:59

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

A work area is established for unloading equipment at the coordinates provided. Caution is advised when passing through this area due to the presence of personnel and equipment, including a crane with a boom height of approximately 50 meters.

Message

MOV AREA WIP (UNLOADING OF EQPT) AT COORD: 143116N 1210014E. RMK: EXER CTN WHEN PSG THE AREA DUE PRESENCE OF MEN AND EQPT (CRANE WITH BOOM HGT APRX 50M).

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

B0729/25 NOTAMR B0373/25
Q) RPHI/QMAHW/IV/BO /A /000/999/1431N12101E005
A) RPLL B) 2502250851 C) 2505312359
E) MOV AREA WIP (UNLOADING OF EQPT) AT COORD: 143116N 1210014E.

RMK: EXER CTN WHEN PSG THE AREA DUE PRESENCE OF MEN AND EQPT
     (CRANE WITH BOOM HGT APRX 50M).
Issued at: 2025-02-25 08:52
Was this helpful?