Work in progress area for unloading of equipment at RPLL.
Period of Applicability
2025-02-25 08:51 - 2025-05-31 23:59
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
Interpretation
A work area is established for unloading equipment at the coordinates provided. Caution is advised when passing through this area due to the presence of personnel and equipment, including a crane with a boom height of approximately 50 meters.
Message
MOV AREA WIP (UNLOADING OF EQPT) AT COORD: 143116N 1210014E. RMK: EXER CTN WHEN PSG THE AREA DUE PRESENCE OF MEN AND EQPT (CRANE WITH BOOM HGT APRX 50M).