Terminal 2 parking bays 30 and 49 are under work for equipment loading and unloading.
2025-03-28 09:31 - 2025-04-30 23:59
Period of Applicability
2025-03-28 09:31 - 2025-04-30 23:59
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, cancel anytime
Interpretation
Parking bays 30 and 49 at Terminal 2 are under work for loading and unloading of equipment. Caution is advised when passing near the area.
Message
TERMINAL 2 ABM PRKG BAY NR 30 (WITH COORD: 143030.3N 1210041.3E) AND PRKG BAY NR 49 (WITH COORD: 143040.5N 1210043.6E) WIP (LOADING AND UNLOADING OF EQPT). RMK: EXER CTN WHEN PSG NEAR THE AREA DUE ...
Map Visualization
Loading map data
Please wait...
© OpenStreetMap contributors
Raw NOTAM
Issued at: 2025-03-28 09:31
Was this helpful?