Period of Applicability
2025-02-20 00:00 - PERM
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, then $24.9/month. Cancel anytime.
Interpretation
Two new aprons have been established at RPMD: a commercial ramp and a general aviation ramp, both with a width of 30m, a concrete surface, and a strength rating of 680/R/B/W/U. These details are referenced in AIP RPMD AD Section 2-2, Section 2.8.
Map Visualization
Loading map data
Please wait...
© OpenStreetMap contributors
Raw NOTAM
Was this helpful?