A2419/25
Checking status...
Instrument Landing Systems

ILS for runway 36 is not available, modifying AIP Volume II.

2025-06-12 04:55 - 2025-07-09 23:59

Period of Applicability

2025-06-12 04:55 - 2025-07-09 23:59

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

The ILS for runway 36 is not available, which modifies the AIP Volume II, specifically AD2.M5, effective from 30 November 2023.

Message

IN IAC ILS Y RWY 36, MM NOT AVBL MODIFIES AIP VOL II, SAME AD2.M5, AMDT AIRAC 2/2023 WEF 30 NOV 2023

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A2419/25 NOTAMN
Q) SAMF/QPIXX/I/B/A/000/999/3249S06847W005
A) SAME
B) 2506120455 C) 2507092359
E) IN IAC ILS Y RWY 36, MM NOT AVBL 
MODIFIES AIP VOL II, SAME AD2.M5, AMDT AIRAC 2/2023 WEF 30 NOV 2023
Issued at: 2025-06-12 04:56
Was this helpful?