Thresholds for multiple runways have been changed.
2025-06-09 23:05 - PERM
Period of Applicability
2025-06-09 23:05 - PERM
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, cancel anytime
Interpretation
Threshold changes have been made for multiple runways: THR 02 to THR 03, THR 20 to THR 21, THR 06 to THR 07, and THR 24 to THR 25. Refer to AIP sections AD 2.8, AD 2.9, AD 2.12, AD 2.13, AD 2.14, AD 2.15, AD 2.20, and AD 2.24 for details.
Message
THR CHANGED: 1- FROM THR 02 TO THR 03 2- FROM THR 20 TO THR 21 3- FROM THR 06 TO THR 07 4- FROM THR 24 TO THR 25 REF: AIP AD 2.8, AD 2.9, AD 2.12, AD 2.13, AD 2.14, AD 2.15, AD 2.20, AD 2.24 ADC, AOC,...
Map Visualization
Loading map data
Please wait...
© OpenStreetMap contributors
Raw NOTAM
Issued at: 2025-06-09 23:07
Was this helpful?