K0605/26
Checking status...
ADTaxiway Operations

Taxiway Y5 deviation between parking stands 50 and 56 is due to work in progress.

2026-05-20 16:56 - 2026-07-01 12:00
Duration:2 months

Period of Applicability

2026-05-20 16:56 - 2026-07-01 12:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Taxiway Y5 deviation between parking stands 50 and 56 is due to work in progress. The existing taxiway centerline in that portion is closed. Taxiway route is available for aircraft up to 36 m wingspan to access parking stands 41 through 52, and aircraft must follow temporary markings and apron control instructions.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

K0605/26 NOTAMR K0560/26
Q) SBCW/QMXXX/V/NBO/A/000/999/2249S04315W005
A) SBGL
B) 2605201656 C) 2607011200
E) TWY Y5 DEVIATION BTN PRKG PSN 50 AND 56 DUW TO WIP.
OBS THE FOLLOWING INFO:
1- PORTION OF EXISTING TWY CENTERLINE CLSD;
2- TWY RTE AVBL FOR ACFT UP TO 36M WINGSPAN TO ACCESS PRKG PSN 41 THRU 52;
3- ACFT SHALL FOLLOW TEMPORARY MARKINGS AND APN CTL INSTRUCTIONS;
Was this helpful?