A2355/25
Checking status...
Approach Procedures

STAR procedures must be kept in navigation databases for the next AIRAC cycle due to a delay in work and DTHR.

2025-08-13 15:22 - 2025-10-13 23:59

Period of Applicability

2025-08-13 15:22 - 2025-10-13 23:59

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

Due to a delay in work and DTHR, specific STAR procedures must be maintained in navigation databases for the next AIRAC cycle, including STAR 1 RWY 02 ERISO 4A / SIRAM 1A and STAR 2 RWY 02 VAGUR 4B / SIRAM 2B, both dated 28 November 2024.

Message

REF SUP AIP S03/2025, DUE TO DELAY IN WORK AND DTHR, THE FOLLOWING PROCEDURES MUST BE KEPT IN NAV DATABASES OR REINCORPORATED FOR NEXT AIRAC CYCLE. STAR 1 RWY 02 ERISO 4A / SIRAM 1A DATED 28 NOV 2024 STAR 2 RWY 02 VAGUR 4B / SIRAM 2B DATED 28 NOV 2024 INSTRUCTIONS: ARICA APP 119.9 MHZ

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A2355/25 NOTAMR A1403/25 
Q) SCFZ/QPAXX/I/NBO/A/000/999/1821S07020W005
A) SCAR B) 2508131522 C) 2510132359 EST
E) REF SUP AIP S03/2025, DUE TO DELAY IN WORK AND DTHR, THE FOLLOWING
PROCEDURES MUST BE KEPT IN NAV DATABASES OR REINCORPORATED FOR NEXT
AIRAC CYCLE.
STAR 1 RWY 02 ERISO 4A / SIRAM 1A DATED 28 NOV 2024
STAR 2 RWY 02 VAGUR 4B / SIRAM 2B DATED 28 NOV 2024
INSTRUCTIONS: ARICA APP 119.9 MHZ
Issued 6 days ago
Was this helpful?