A0712/25
Checking status...
Construction Activity

Excavation work near RWY 07 at Punta Arenas.

2025-03-13 20:01 - 2025-05-13 20:00

Period of Applicability

2025-03-13 20:01 - 2025-05-13 20:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

Excavation work is taking place 2 meters deep located 100 meters from RWY 07, affecting the first 780 meters of the right side of the runway. Caution is advised.

Message

STP RWY 07 EXCAVATION 2M DPT LOC 100M FM RWY 07 INITIAL 780M OF RIGHT STP. CTN INSTRUCTIONS: PUNTA ARENAS TWR 118.7MHZ PUNTA ARENAS GNDC 121.9MHZ

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A0712/25 NOTAMN 
Q) SCCZ/QMWHW/IV/M/A/000/999/5300S07051W005
A) SCCI B) 2503132001 C) 2505132000
E) STP RWY 07 EXCAVATION 2M DPT LOC 100M FM RWY 07 INITIAL 780M OF
RIGHT STP. CTN
INSTRUCTIONS: PUNTA ARENAS TWR  118.7MHZ
              PUNTA ARENAS GNDC 121.9MHZ
Issued at: 2025-03-13 19:57