A2488/26
Checking status...
ADRunway Operations

Runway 17R is limited by asphalt repairs, with reduced declared distances.

2026-09-22 10:00 - 2026-10-09 22:59
Duration:aggregated 8 days

Period of Applicability

2026-09-22 10:00 - 2026-10-09 22:59

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Runway 17R is limited due to asphalt surface repair work on its last third on September 22–25 and 28–30, and October 1–2 and 5–9, from 1000 to 2259. During these periods, TORA, TODA, ASDA, and LDA are each 2,069 metres; outside these hours, declared distances remain as published in the AIP.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A2488/26 NOTAMN
Q)SCEZ/QMDCH/IV/NBO/A/000/999/3324S07048W005
A)SCEL B)2609221000 C)2610092259
D)SEP 22-25 28-30 OCT 1-2 5-9 BTN 1000-2259
E)RWY 17R LTD DUE TO ASPH SFC REPAIR WORKS ON LAST THIRD OF RWY
DECLARED DISTANCES: TORA 2069M TODA 2069M ASDA 2069M LDA 2069M
OUTSIDE THE ABOVE HR DECLARED DISTANCES SHALL BE AS PUBLISHED IN
AIP