A3086/26
Checking status...
ADRunway Operations

Runway 17R declared distances are reduced during asphalt repair work.

2026-10-30 14:34 - 2026-11-14 23:00
Duration:aggregated 7 days

Period of Applicability

2026-10-30 14:34 - 2026-11-14 23:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Runway 17R is limited during work in progress to repair the asphalt surface on its last third. TORA, TODA, ASDA and LDA are each 2,300 m, in accordance with SUP S16/2026. The limitation applies October 30–November 14, Monday–Saturday, 1000–2300, excluding holidays; outside those hours, declared distances are as published in the AIP.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A3086/26 NOTAMR A3083/26
Q)SCEZ/QMRLT/IV/NBO/A/000/999/3324S07048W005
A)SCEL B)2610301434 C)2611142300
D)OCT 30-NOV 14 MON-SAT 1000-2300 EXC HOL
E)RWY 17R LTD WHILE WIP DUE TO ASPH SFC REPAIR WORKS ON LAST THIRD
OF RWY DECLARED DIST:
TORA 2300M TODA 2300M ASDA 2300M LDA 2300M
ACCORDING WITH SUP S16/2026
OUTSIDE THE ABV HR DECLARED DIST SHALL BE AS PUBLISHED IN AIP
Was this helpful?