A2161/25
Checking status...
Other

Probe balloon ascent over Trujillo Aerodrome requires prior coordination.

2025-07-08 13:45 - 2025-10-08 13:45

Period of Applicability

2025-07-08 13:45 - 2025-10-08 13:45

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

A probe balloon will ascend over Trujillo Aerodrome, requiring prior coordination with Trujillo Tower and Lima ACC. The operation is scheduled from 1130 to 1345.

Message

ASCENT OF PROBE BALLOON OVER TRUJILLO AD. PREVIOUS COOR WITH TRUJILLO TWR AND LIMA ACC IS REQUIRED. COORD: 080238S0790334W RDO: 19NM

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A2161/25 NOTAMR A1296/25
Q) SPIM/QWLLW/IV/NBO/W/000/999/0802S07903W019
A) SPRU B) 2507081345 C) 2510081345 EST
D) 1130-1345
E) ASCENT OF PROBE BALLOON OVER TRUJILLO AD. PREVIOUS COOR WITH
TRUJILLO TWR AND LIMA ACC IS REQUIRED. 
COORD: 080238S0790334W     RDO: 19NM
F) GND G) UNL
Issued 11 days ago
Was this helpful?