A0017/25
Checking status...
Airspace Restrictions

Operational trials for surveillance approach procedures in Timehri TMA with specific separation requirements.

2025-03-18 12:00 - 2025-06-18 23:59

Period of Applicability

2025-03-18 12:00 - 2025-06-18 23:59

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

Operational trials for surveillance approach procedures are being conducted within the Timehri TMA, with a horizontal separation of 5 NM below FL245 unless a greater minimum is required. Contact ATC on 119.4 MHz for surveillance approach information.

Message

OPR TRIALS FOR SURVEILLANCE APP ACT WI TIMEHRI TMA. EXP 5 NM HORIZONTAL SEPARATION BELOW FL245, UNLESS A GREATER MNM IS REQUIRED. CTC ATC ON 119.4MHZ FOR SURVEILLANCE APP. THIS SUPPLEMENTS INFO WI ...

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A0017/25 NOTAMN
Q) SYGC/QSPXX/IV/NBO/AE/020/245/0629N05815W075
A) SYCJ B) 2503181200 C) 2506182359
E) OPR TRIALS FOR SURVEILLANCE APP ACT WI TIMEHRI TMA. EXP 5 NM
 HORIZONTAL SEPARATION BELOW FL245, UNLESS A GREATER MNM IS REQUIRED.
 CTC ATC ON 119.4MHZ FOR SURVEILLANCE APP. THIS SUPPLEMENTS INFO WI
 GUYANA AIP - ENR 1.6.
F) FL 020 G) FL 245
Issued at: 2025-03-17 20:08
Was this helpful?