Sprinklers installed north of runway 11/29 with a maximum height of 6 inches.
2025-02-26 11:00 - 2025-05-25 23:00
Period of Applicability
2025-02-26 11:00 - 2025-05-25 23:00
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, cancel anytime
Interpretation
Sprinklers have been installed in the field north of runway 11/29, with a maximum height of 6 inches. The sprinklers are frangible, and ATC will advise when they are in operation. Operations are scheduled from 1100 to 2300.
Message
IN FIELD SPRINKLERS INSTALLED NORTH OF RWY 11/29. MAXIMUM HEIGHT 6 INCHES. SPRINKLERS ARE FRANGIBLE. ATC TO ADVISE WHEN IN OPERATION.
Map Visualization
Loading map data
Please wait...
© OpenStreetMap contributors
Raw NOTAM
Issued at: 2025-02-25 16:42
Was this helpful?