Work in progress at Wasa Caroni Treatment Plant with cranes operating near runway 10/28.
2025-04-16 11:00 - 2025-07-14 02:00
Period of Applicability
2025-04-16 11:00 - 2025-07-14 02:00
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, cancel anytime
Interpretation
A work in progress at Wasa Caroni Treatment Plant involves three cranes operating 1000 meters south of the runway 10/28 centerline, with a height of no more than 19 meters. The cranes are equipped with the relevant obstacle lighting fixtures. Work is scheduled Monday to Friday from 1100 to 0200 and Saturday and Sunday from 1200 to 0200.
Message
WIP AT WASA CARONI TREATMENT PLANT. THREE(3) CRANES IN OPERATION, 1000M SOUTH OF THE RWY 10/28 CENTRE LINE, NOT MORE THAN 19M IN HEIGHT. EQUIPPED WITH THE RELEVANT OBSTACLE LIGHTING FIXTURES. F) SFC G...
Map Visualization
Loading map data
Please wait...
© OpenStreetMap contributors
Raw NOTAM
Issued at: 2025-04-16 22:49
Was this helpful?