C1927/25
Checking status...
Runway Operations

Runway 12/30 switch over time to secondary power supply up to 15 seconds.

2025-04-02 05:33 - 2025-07-02 23:59

Period of Applicability

2025-04-02 05:33 - 2025-07-02 23:59

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

The runway 12/30 will experience a switch over time to the secondary power supply, which may last up to 15 seconds.

Message

RWY 12/30 SWITCH OVER TIME TO SECONDARY POWER SUPPLY UP TO 15 SECONDS.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

C1927/25 NOTAMR C1254/25
Q) UATT/QLRXX/IV/NBO/A /000/999/5015N05712E005
A) UATT B) 2504020533 C) 2507022359
E) RWY 12/30 SWITCH OVER TIME TO SECONDARY POWER SUPPLY  UP TO 15 
SECONDS.
Issued at: 2025-04-02 05:33
Was this helpful?