G0529/26
Checking status...
OBSConstruction Activity

Three new wind turbine generator obstacles designated KASPI 1, KASPI 2, and KASPI 3 have been erected.

2026-09-04 09:17 - 2026-12-06 23:59
Duration:LONG4 months

Period of Applicability

2026-09-04 09:17 - 2026-12-06 23:59

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Three new wind turbine generator obstacles have been erected: KASPI 1 at 415349N 0442201E, elevation 3,300 ft AMSL and height 627 ft AGL; KASPI 2 at 415347N 0442226E, elevation 3,400 ft AMSL and height 627 ft AGL; and KASPI 3 at 415336N 0442216E, elevation 3,300 ft AMSL and height 627 ft AGL.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

G0529/26 NOTAMR G0430/26
Q) UGGG/QOBCE/IV/M  /E /000/034/4154N04422E001
A) UGGG B) 2609040917 C) 2612062359
E) NEW OBST (WIND TURBINE GENERATORS) ERECTED:
KASPI 1: 415349N 0442201E, ELEV 3300FT AMSL, HGT 627FT AGL
KASPI 2: 415347N 0442226E, ELEV 3400FT AMSL, HGT 627FT AGL
KASPI 3: 415336N 0442216E, ELEV 3300FT AMSL, HGT 627FT AGL
Was this helpful?