G0159/26
Checking status...
ADRunway Operations

Construction near RWY 07 causes RWY 25 CWY and stopway unavailability with adjusted RWY 25 declared distances.

2026-03-26 10:33 - 2026-06-25 11:00
Duration:LONG4 months

Period of Applicability

2026-03-26 10:33 - 2026-06-25 11:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Temporary limitations due to construction work in progress 150 m west of RWY 07 threshold. RWY 25 clearway and stopway are temporarily not available. RWY 25 declared distances: TODA 2500 m and ASDA 2500 m. RWY 25 RESA 90 m x 150 m available. RWY 07/25 runway strip 2680 m x 300 m available.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

G0159/26 NOTAMR G0823/25
Q) UGGG/QMRLT/IV/NBO/A /000/999/4211N04229E005
A) UGKO B) 2603261033 C) 2606251100
E) FLW TEMPO LIMITATIONS APPLY DUE TO CONST WIP 150M WEST OF RWY 07
THR:
RWY 25 RESA 90MX150M AVBL.
RWY 07/25 STRIP 2680MX300M AVBL.
RWY 25 CWY TEMPO NOT AVBL.
RWY 25 STOPWAY TEMPO NOT AVBL.
RWY 25 TODA 2500M AVBL.
RWY 25 ASDA 2500M AVBL.
Was this helpful?