Construction work in progress 150 meters west of runway 07 threshold with temporary limitations.
2025-06-25 06:00 - 2025-09-25 06:00
Period of Applicability
2025-06-25 06:00 - 2025-09-25 06:00
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, cancel anytime
Interpretation
Construction work in progress 150 meters west of runway 07 threshold with temporary limitations applying. Runway 25 RESA, strip, and TODA are available, but CWY and stopway are temporarily not available.
Message
CONST WIP 150M WEST OF RWY 07 THR FLW TEMPO LIMITATIONS APPLY: RWY 25 RESA 90MX150M AVBL. RWY 25 STRIP 2680MX300M AVBL. RWY 25 CWY TEMPO NOT AVBL. RWY 25 STOPWAY TEMPO NOT AVBL. RWY 25 TODA 2500M AVBL...