Period of Applicability
2026-06-10 21:00 - 2026-09-10 21:00
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, then $24.9/month. Cancel anytime.
Interpretation
Helipad 1 is put into operation between TWY 1 and TWY D at LARP 502502C 1272454E, elevation 194 m. The surface is asphalt-concrete, dimensions are 23 m by 23 m, PCN 49/F/D/W/U, and day markings are provided. Operating hours are during daylight hours, and the helipad is available for MI-8 and smaller aircraft.
Map Visualization
Loading map data
Please wait...
© OpenStreetMap contributors
Raw NOTAM
Was this helpful?