Runway 02 approach and runway lighting may be unavailable during power supply switchover.
2025-10-21 04:55 - 2025-11-21 06:00
Period of Applicability
2025-10-21 04:55 - 2025-11-21 06:00
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, cancel anytime
Interpretation
The switchover time from the main to the secondary power supply for Runway 02 approach lighting and runway lighting is 5 minutes, which may cause a brief lighting outage during power transfer.
Message
RWY 02: SWITCH OVER TIME FOR APCH LGT SYSTEM AND RWY LGT FM MAIN POWER SUPPLY UNIT TO SECONDARY POWER SUPPLY UNIT IS 5 MIN