A4701/26
EST
Checking status...
ADApron Operations

MI-8 operations at stands 4 and 5 are permitted under the aircraft’s own engine power.

2026-07-23 03:56 - 2026-10-23 23:59
Duration:LONG4 months EST

Period of Applicability

2026-07-23 03:56 - 2026-10-23 23:59

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

For MI-8 aircraft, parking, engine run-up for technical checks, engine start-up, and taxiing into or out of stands 4 and 5 are permitted under the aircraft’s own engine power.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A4701/26 NOTAMR A2484/26
Q)UHHH/QFAXX/IV/NBO/A/000/999/4653N14243E005
A)UHSS B)2607230356 C)2610232359 EST
E)ACFT PARKING, ENG RUN-UP (TECHNICAL CHECK),ENG START-UP, TAX
INTO/OUT OF STANDS 4,5 PERMITTED UNDER OWN ENG PWR (ACFT TYPE MI-8)
Was this helpful?