A4578/26
Checking status...
ADAirport Operations

Limited TS-1 fuel availability restricts refuelling and imposes fuel limits and PPR requirements for flights to and from UIBB.

2026-07-17 07:00 - 2026-09-30 23:59
Duration:3 months

Period of Applicability

2026-07-17 07:00 - 2026-09-30 23:59

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Due to limited quantity of TS-1 fuel, refuelling of non-scheduled aircraft is provided strictly by PPR, the aerodrome is available as an alternate without refuelling, airlines planning a flight to UIBB aerodrome shall provide the maximum assumed quantity of fuel for the return departure, refuelling is not provided for technical landing, fuel limits apply for scheduled, non-scheduled and charter flights from UIBB aerodrome to the listed destinations, and refuelling of TC-1 above the limit is carried out strictly by PPR 3 days before planned departure.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A4578/26 NOTAMR A4149/26
Q)UIII/QFULT/IV/NBO/A/000/999/5622N10142E005
A)UIBB B)2607170700 C)2609302359
E)DUE TO LIMITED QUANTITY OF TS-1 FUEL:
- REFUELING OF NON-SKED ACFT PROVIDED STRICTLY BY PPR,
- AD AVBL AS ALTN WO REFUELING,
- WHEN PLANNING FLT TO UIBB AD, AIRLINES SHALL PROVIDE MAX
ASSUMED QUANTITY OF FUEL FOR RETURN DEP.
- REFUELING NOT PROVIDED FOR TECHNICAL LDG.
- FUEL LIMITS FOR SKED/NON-SKED AND CHARTER FLT FROM IUBB AD
TO AD OF DESTINATION:
- UIII: UP TO 1 T,
- UNNT: UP TO 2 T,
- UEMO: UP TO 3 T,
- UECT: UP TO 7 T,
- UWUU: UP TO 7 T,
- USNN: UP TO 7 T,
- UUDD: UP TO 15 T,
- USTR: UP TO 7 T,
- UELL: UP TO 5 T,
- UNKL: UP TO 1 T.
- REFUELLING OF TC-1 ABOVE LIMIT CARRIED OUT STRICTLY BY PPR
3 DAYS BEFORE PLANNED DEP.
Was this helpful?