A6593/26
EST
Checking status...
NavDeparture Procedures

PETAP 1A, 1B, 1C, and 1D SIDs and transitions to T457 and T821 are unavailable.

2026-09-21 06:00 - 2026-12-21 19:00
Duration:aggregated 2 months EST

Period of Applicability

2026-09-21 06:00 - 2026-12-21 19:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

SID PETAP 1D, PETAP 1A, PETAP 1C, and PETAP 1B, including their transitions to routes T457 and T821, are unavailable daily from 0600 to 1900.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A6593/26 NOTAMR A6528/26
Q)ULLL/QPDXX/I/NBO/A/000/999/5948N03016E025
A)ULLI B)2609210600 C)2612211900 EST
D)DAILY 0600-1900
E)FLW SID NOT AVBL:
- SID PETAP 1D AND TRANSITION TO RTE T457, T821,
(REF AIP PAGE AD 2.1 ULLI-139),
- SID PETAP 1A AND TRANSITION TO RTE T457, T821,
(REF AIP PAGE AD 2.1 ULLI-140),
- SID PETAP 1C AND TRANSITION TO RTE T457, T821,
(REF AIP PAGE AD 2.1 ULLI-141),
- SID PETAP 1B AND TRANSITION TO RTE T457, T821.
(REF AIP PAGE AD 2.1 ULLI-142).
Was this helpful?