A6807/25
Checking status...
Taxiway Operations

Taxiway F joining apron north and runway 13/31 is in operation with limitations on width and maximum authorized aircraft mass.

2025-09-10 00:00 - 2025-12-10 23:59

Period of Applicability

2025-09-10 00:00 - 2025-12-10 23:59

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

Taxiway F joining apron north and runway 13/31 is in operation. Taxiway width 8 m, pavement asphalt-concrete, maximum authorized aircraft mass 3 tons.

Message

TWY F JOINING APRON NORTH AND RWY 13/31 PUT INTO OPERATION. TWY WIDTH 8M, PAVEMENT ASPHALT-CONCRETE, ACFT MAX AUTHORIZED MASS 3 TONS.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

Q) ULLL/QMXCS/IV/M/A/000/999/6847N03245E002
A) ULMM B) 2509100000 C) 2512102359
E) TWY F JOINING APRON NORTH AND RWY 13/31 PUT INTO OPERATION.
TWY WIDTH 8M, PAVEMENT ASPHALT-CONCRETE,
ACFT MAX AUTHORIZED MASS 3 TONS.
Issued 13 days ago
Was this helpful?