Period of Applicability
2024-11-06 11:40 - PERM
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, cancel anytime
Interpretation
The southern part of the airport has a designated taxi route (RTE 1) between aircraft stands 29 and taxiway B. The northern part has a designated taxi route (RTE 2) between taxiway C and taxiway B.
Message
APN 1: - TAX RTE (SOUTHERN PART OF APN) BETWEEN ACFT STANDS 29 AND TWY B DESIGNATED AS - RTE 1. - TAX RTE (NORTHERN PART OF APN) BETWEEN TWY C AND TWY B DESIGNATED AS - RTE 2. REF AIP PAGE AD 2.1 UMKK...
Map Visualization
Loading map data
Please wait...
© OpenStreetMap contributors
Raw NOTAM
Issued at: 2024-11-06 11:57
Was this helpful?