A1213/25
Checking status...
Construction Activity

Earthwork operations in progress near runway 25 and 07.

2025-03-03 11:30 - 2025-06-03 11:30

Period of Applicability

2025-03-03 11:30 - 2025-06-03 11:30

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

Earthwork operations are taking place during daytime, located 2850 meters from threshold 25 towards threshold 07 and 150 meters north of the runway axis. Equipment up to 5 meters high is operational at this site.

Message

EARTHWORK OPS INPR DRG DAYTIME AT DIST 2850M FM THR 25 TOWARDS THR 07 AND 150M NORTH OF RWY AXIS. EQPT UP TO 5M HIGH OPR.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A1213/25 NOTAMN
Q) UNNT/QFAHW/IV/NBO/A/000/999/5501N08239E005
A) UNNT B) 2503031130 C) 2506031130
E) EARTHWORK OPS INPR DRG DAYTIME AT DIST 2850M FM THR 25 TOWARDS
THR 07 AND 150M NORTH OF RWY AXIS. EQPT UP TO 5M HIGH OPR.
Issued at: 2025-03-03 11:25
Was this helpful?