A1213/25
Checking status...
Runway Operations

Earthwork operations are taking place near runway 25 and runway 07.

2025-03-03 11:30 - 2025-06-03 11:30

Period of Applicability

2025-03-03 11:30 - 2025-06-03 11:30

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

Earthwork operations are in progress during daytime at a distance of 2850 meters from the threshold of runway 25 towards the threshold of runway 07, and 150 meters north of the runway axis. Equipment up to 5 meters high is operating in the area.

Message

EARTHWORK OPS INPR DRG DAYTIME AT DIST 2850M FM THR 25 TOWARDS THR 07 AND 150M NORTH OF RWY AXIS. EQPT UP TO 5M HIGH OPR.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A1213/25 NOTAMN
Q) UNNT/QFAHW/IV/NBO/A/000/999/5501N08239E005
A) UNNT B) 2503031130 C) 2506031130
E) EARTHWORK OPS INPR DRG DAYTIME AT DIST 2850M FM THR 25 TOWARDS
THR 07 AND 150M NORTH OF RWY AXIS. EQPT UP TO 5M HIGH OPR.
Issued at: 2025-03-03 11:25
Was this helpful?