A2197/26
Checking status...
ADApron Operations

Apron has work in progress and aircraft must taxi at reduced speed with increased caution.

2026-04-09 06:00 - 2026-12-26 12:00
Duration:VERY LONG9 months

Period of Applicability

2026-04-09 06:00 - 2026-12-26 12:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Construction work is in progress on the apron due to repairs; aircraft should taxi at reduced speed with increased attention.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

Q) UNNT/QMNHW/IV/BO/A/000/999/5623N08513E005
A) UNTT B) 2604090600 C) 2612261200
E) DUE TO REPAIR: CONSTRUCTION WIP ON APRON. ACFT SHOULD TAX ON LOWER
SPEED WITH INCREASED ATTENTION.
Was this helpful?