A2899/25
Checking status...
Unknown Category

Ongoing work on the tower building south of runway 08 threshold.

2025-04-28 07:00 - 2025-07-30 09:00

Period of Applicability

2025-04-28 07:00 - 2025-07-30 09:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

There is ongoing work in progress on the tower building located 800 meters south of the threshold of runway 08, at coordinates N432304.4 E0454114.7, with an altitude of 210 meters.

Message

TWR BUILDING WIP SOUTH OF THR 08 AT DIST 800M, COORD N432304.4 E0454114.7, ALT 210M.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A2899/25 NOTAMR A0607/25
Q) URRV/QOBCE/IV/M/AE/000/999/4323N04542E005
A) URMG B) 2504280700 C) 2507300900
E) TWR BUILDING WIP SOUTH OF THR 08 AT DIST 800M,
COORD N432304.4 E0454114.7, ALT 210M.
Issued at: 2025-04-28 07:24
Was this helpful?