Ongoing work on the tower building south of runway 08 threshold.
2025-04-28 07:00 - 2025-07-30 09:00
Period of Applicability
2025-04-28 07:00 - 2025-07-30 09:00
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, cancel anytime
Interpretation
There is ongoing work in progress on the tower building located 800 meters south of the threshold of runway 08, at coordinates N432304.4 E0454114.7, with an altitude of 210 meters.
Message
TWR BUILDING WIP SOUTH OF THR 08 AT DIST 800M, COORD N432304.4 E0454114.7, ALT 210M.
Map Visualization
Loading map data
Please wait...
© OpenStreetMap contributors
Raw NOTAM
Issued at: 2025-04-28 07:24
Was this helpful?