A5513/26
PERM
Checking status...
ADLighting Systems

All aerodrome lighting has a secondary-power switch-over time of 1 second instead of the published value.

2026-08-19 06:28 - PERM
Duration:PERMANENT

Period of Applicability

2026-08-19 06:28 - PERM

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Secondary power is available to all aerodrome lighting with a switch-over time of 1 second instead of the published value. Refer to AIP AD 2.1 URML-6, Table AD 2.15.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A5513/26 NOTAMR A5481/26
Q)URRV/QFAXX/IV/NBO/A/000/999/4249N04739E005
A)URML B)2608190628 C)PERM
E)SECONDARY POWER SUPPLY/SWITCH-OVER TIME
AVBL TO ALL LIGHTING AT AD/ 1 SEC INSTEAD OF PUBLISHED.
REF AIP AD 2.1 URML-6, TABLE AD 2.15.
Was this helpful?