Repair work in progress on the apron may affect aircraft operations.
2025-05-16 00:00 - 2025-08-15 23:59
Period of Applicability
2025-05-16 00:00 - 2025-08-15 23:59
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, cancel anytime
Interpretation
Work in progress on the apron may require arriving aircraft to shut down engines on taxiway A after vacating the runway and then be towed to their stand. Departing aircraft will be towed to taxiway A for start-up.
Message
REPAIR WIP ON APRON. IF NECESSARY, ARR ACFT EXPECT TO SHUT DOWN ENG ON TWY A AFTER VACTING RWY AND THEN TOWED TO STAND, DEP ACFT - TOWED TO TWY A FOR START-UP.