Work in progress on the north side of taxiway P between taxiways B and R4.
2025-04-18 12:30 - 2025-06-20 12:30
Period of Applicability
2025-04-18 12:30 - 2025-06-20 12:30
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, cancel anytime
Interpretation
There is ongoing work on the north side of taxiway P, specifically between taxiways B and R4. Aircraft movements and equipment will need to be shifted beyond 43.5 meters during wide-body aircraft movements. Pilots are advised to exercise caution while taxiing.
Message
WIP NORTH SIDE OF TWY P BTN TWY B TO TWY R4 AT A DISTANCE OF 26M FM CL OF TWY P. DRG WIDE BODY ACFT MOV MEN AND EQPT SHALL BE SHIFTED BEYOND 43.5M. PILOTS TO EXER CTN WHILE TAX