Work is in progress near RWY 05/23 with closures affecting portions of TWY K, TWY F, and the isolated parking position, and a temporary alternate isolated parking is set on TWY P.
Period of Applicability
2025-10-17 08:00 - 2026-01-16 12:30
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
Interpretation
Work in progress in multiple areas: on the northern side of RWY 05/23 between the beginning of RWY 23 and TWY R4 at 105 m from the runway centerline with a maximum movable machinery height of 3 m; a portion of TWY K between TWY M and the Indian Air Force apron is closed with Indian Air Force aircraft to taxi via TWY K and TWY M for access to the Indian Air Force apron; the isolated aircraft parking position and TWY F are closed due to work, with an alternate isolated aircraft parking position provided on TWY P between TWY D and TWY R4. Pilots are to exercise caution.
Message
WIP IN FLW AREAS: 1 NORTHERN SIDE OF RWY 05/23 BTN BEGINNING OF RWY 23 TO TWY R4 AT A DIST OF 105M FM RCL. MAX HGT FOR MOVABLE MACHINERY IS 3M. 2 PORTION OF TWY K BTN TWY M AND INDIAN AIR FORCE APN CLSD DUE WIP.ALL INDIAN AIR FORCE ACFT TO TAXI VIA TWY K TWY M AND VICE VERSA FOR INDIAN AIR FORCE APN. 3 ISOL ACFT PRKG PSN AND TWY F CLSD DUE WIP. AN ALTN ISOL ACFT PRKG PSN IS PROVIDED ON TWY P BTN TWY D AND TWY R4. REFER EAIP INDIA VAAH AD 2.8.6.5. PILOTS TO EXER CTN.