A0707/26
Checking status...
ADTaxiway Operations

Portion of TWY B closed due to culvert construction.

2026-05-08 16:30 - 2026-06-20 12:30
Duration:2 months

Period of Applicability

2026-05-08 16:30 - 2026-06-20 12:30

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Portion of TWY B is closed due to storm water drain culvert construction work in progress. TWY A and a portion of TWY B are available for aircraft taxi to APN 1 and APN 3. Pilots are to carry extra fuel due to anticipated delays and exercise caution. Maximum equipment height is 10 m. The worksite is marked and lighted.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A0707/26 NOTAMN
Q) VABF/QMXLC/IV/B/A/000/999/2304N07238E005
A) VAAH B) 2605081630 C) 2606201230
E) PORTION OF TWY B CLSD DUE STORM WATER DRAIN
CULVERT CONST WIP. TWY A AND PORTION OF TWY B AVBL
FOR ACFT TAXI TO APN 1 AND APN 3.
WORKSITE LOCATED BTN 105 M FM RCL AND 50 M FM CL OF TWY P.
ALL PILOTS TO CARRY EXTRA FUEL DUE TO ANY ANTICIPATED
DLA. MAX HGT EQPT 10 M.WORKSITE MARKED AND LGTD.
PILOTS TO EXER CTN
Was this helpful?