A1142/25
Checking status...
Taxiway Operations

Work in progress on the north side of taxiway P requires caution during taxiing.

2025-07-18 12:00 - 2025-09-18 12:30

Period of Applicability

2025-07-18 12:00 - 2025-09-18 12:30

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

Work in progress on the north side of taxiway P between taxiway B and taxiway R4, 26 meters from the centerline of taxiway P. During wide-body aircraft movements, men and equipment will be shifted beyond 43.5 meters. Pilots are advised to exercise caution while taxiing.

Message

WIP NORTH SIDE OF TWY P BTN TWY B TO TWY R4 AT A DIST OF 26M FM CL OF TWY P. DRG WIDE BODY ACFT MOV MEN AND EQPT SHALL BE SHIFTED BEYOND 43.5M. PILOT TO EXER CTN WHILE TAX

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

Q) VABF/QMXXX/IV/B/A/000/999/
A) VAAH B) 2507181200 C) 2509181230
E) WIP NORTH SIDE OF TWY P BTN TWY B TO TWY R4 AT A DIST
OF 26M FM CL OF TWY P. DRG WIDE BODY ACFT MOV MEN AND
EQPT SHALL BE SHIFTED BEYOND 43.5M.
PILOT TO EXER CTN WHILE TAX
Issued 24 days ago
Was this helpful?