Work in progress on the north side of taxiway P requires caution during taxiing.
2025-07-18 12:00 - 2025-09-18 12:30
Period of Applicability
2025-07-18 12:00 - 2025-09-18 12:30
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, cancel anytime
Interpretation
Work in progress on the north side of taxiway P between taxiway B and taxiway R4, 26 meters from the centerline of taxiway P. During wide-body aircraft movements, men and equipment will be shifted beyond 43.5 meters. Pilots are advised to exercise caution while taxiing.
Message
WIP NORTH SIDE OF TWY P BTN TWY B TO TWY R4 AT A DIST OF 26M FM CL OF TWY P. DRG WIDE BODY ACFT MOV MEN AND EQPT SHALL BE SHIFTED BEYOND 43.5M. PILOT TO EXER CTN WHILE TAX
Map Visualization
Loading map data
Please wait...
© OpenStreetMap contributors
Raw NOTAM
Issued 24 days ago
Was this helpful?