Work in progress affecting the northern side of runway 05/23, a portion of taxiway K, isolation parking and taxiway F with restrictions, closures and an alternate parking position provided.
Period of Applicability
2025-09-01 14:40 - 2025-10-15 12:30
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
Interpretation
Work in progress affecting multiple aerodrome areas: northern side of runway 05/23 between the beginning of runway 23 and taxiway R4 at about 105 m from the runway centreline where movable machinery is limited to 3 m height; a portion of taxiway K between taxiway M and the Indian Air Force apron is closed due to work in progress and Indian Air Force aircraft should taxi via taxiway K and taxiway M (and vice versa) for access to the Indian Air Force apron; isolation aircraft parking position and taxiway F are closed due to work in progress and an alternate isolation parking position is provided on taxiway P between taxiway D and taxiway R4. Pilots to exercise caution.
Message
WIP IN FLW AREAS: 1 NORTHERN SIDE OF RWY 05/23 BTN BEGINNING OF RWY 23 TO TWY R4 AT A DIST OF 105M FM RCL. MAX HGT FOR MOVABLE MACHINERY IS 3M. 2 PORTION OF TWY K BTN TWY M AND INDIAN AIR FORCE APN CLSD DUE WIP.ALL INDIAN AIR FORCE ACFT TO TAXI VIA TWY K TWY M AND VICE VERSA FOR INDIAN AIR FORCE APN. 3 ISOL ACFT PRKG PSN AND TWY F CLSD DUE WIP. AN ALTN ISOL ACFT PRKG PSN IS PROVIDED ON TWY P BTN TWY D AND TWY R4. REFER EAIP INDIA VAAH AD 2.8.6.5. PILOTS TO EXER CTN.