A1070/25
Checking status...
Navigation Aid Status

AWOS systems commissioned at multiple runway touchdown points.

2025-07-01 08:00 - PERM

Period of Applicability

2025-07-01 08:00 - PERM

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

AWOS systems have been commissioned at multiple locations on the runways, specifically at touchdown points for RWY 27, RWY 14, RWY 09, and RWY 32, as well as midpoints for RWY 09/27 and RWY 14/32. The AIP India VABB AD 2.11 should be amended accordingly.

Message

AWOS SYSTEMS(METROLOGICAL AIDS.) COMMISSIONED AT TOUCHDOWN RWY 27/RWY 14/RWY 09/RWY 32 MID RWY 09/27 AND MID RWY 14/32. AMEND AIP INDIA VABB AD 2.11 ACCORDINGLY.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A1070/25 NOTAMN
Q) VABF/QFMCS/IV/BO/A/000/999/1906N07252E005
A) VABB B) 2507010800 C) PERM
E) AWOS SYSTEMS(METROLOGICAL AIDS.) COMMISSIONED AT 
   TOUCHDOWN RWY 27/RWY 14/RWY 09/RWY 32 MID RWY 09/27
   AND MID RWY 14/32.
   AMEND AIP INDIA VABB AD 2.11 ACCORDINGLY.
Issued 3 months ago
Was this helpful?