G0319/25
Checking status...
Approach Procedures

RNP Y procedure for Runway 14 at Mumbai Airport temporarily withdrawn.

2025-04-02 16:55 - 2025-07-01 23:59

Period of Applicability

2025-04-02 16:55 - 2025-07-01 23:59

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

The RNP Y procedure for Runway 14 at Mumbai Airport is temporarily withdrawn due to a visual segment surface infringement.

Message

REF AIP INDIA PAGE AD 2 VABB 3-905 (31 DEC 2020) REGARDING RNP Y RWY 14 PROC OF MUMBAI AIRPORT. THE PROC IS TEMPO WITHDRAWN DUE VISUAL SEGMENT SURFACE (VSS) INFRINGEMENT.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

G0319/25 NOTAMN
Q) VABF/QPIAW/I/NBO/A/000/999/1906N07252E005
A) VABB B) 2504021655 C) 2507012359 EST
E) REF AIP INDIA PAGE AD 2 VABB 3-905 (31 DEC 2020) REGARDING RNP Y
RWY 14 PROC OF MUMBAI AIRPORT. THE PROC IS TEMPO WITHDRAWN DUE
VISUAL SEGMENT SURFACE (VSS) INFRINGEMENT.
Issued at: 2025-04-02 17:02
Was this helpful?