G0299/25
Checking status...
Approach Procedures

ILS(Z) RWY 19L procedure is temporarily withdrawn due to ILS replacement.

2025-04-02 00:00 - 2025-05-31 23:59

Period of Applicability

2025-04-02 00:00 - 2025-05-31 23:59

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

The ILS(Z) procedure for runway 19L (CAT-II) at Kolkata Airport is temporarily withdrawn due to the replacement of the ILS system. This is referenced in the AIP dated 19 May 2022.

Message

REF AIP INDIA PAGE AD2 VECC 2-109 (19 MAY 2022) REGARDING ILS(Z) RWY 19L (CAT-II) PROC OF KOLKATA AP. THE PROC IS TEMPO WITHDRAWN DUE REPLACEMENT OF ILS. CNS123W SEQUENCE CHECK FOR VIDPYNYX G -- ...

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

G0299/25 NOTAMN
Q) VECF/QPIAW/I/NBO/A/000/999/2239N08827E005
A) VECC B) 2504020000 C) 2505312359 EST
E) REF AIP INDIA PAGE AD2 VECC 2-109 (19 MAY 2022) REGARDING ILS(Z)
RWY 19L (CAT-II) PROC OF KOLKATA AP. THE PROC IS TEMPO WITHDRAWN DUE
REPLACEMENT OF ILS.


CNS123W SEQUENCE CHECK FOR VIDPYNYX G -- 
  EXPECTED G0300/25 -- RECEIVED G0299/25
CNN038W DUPLICATE NOTAM
TRANSACTION ROLLED BACK, RETCODE = 14
Issued at: 2025-03-25 05:26
Was this helpful?