Taxiway A is upgraded and available for operations.
2025-05-02 05:38 - 2025-07-30 23:59
Period of Applicability
2025-05-02 05:38 - 2025-07-30 23:59
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, cancel anytime
Interpretation
Taxiway A is now available for operations after being upgraded, with a shoulder width of 7.5 meters on each side, extending from its intersection with the western shoulder of runway 19R/01L to 80 meters south of its intersection with taxiway C.
Message
TWY A FM ITS INT WITH WESTERN SHOULDER RWY 19R/01L TO 80M SOUTH OF ITS INT WITH TWY C AND TWY C BTN RWY 19R/01L AND TWY A IS UPGRADED AND AVBL FOR OPS. DESIGNATION:A SHOULDER:7.5M ON EACH SIDE WID:2...
Map Visualization
Loading map data
Please wait...
© OpenStreetMap contributors
Raw NOTAM
Issued at: 2025-05-02 05:46
Was this helpful?