A1351/25
Checking status...
Apron Operations

VDGS unavailable at multiple bays due to work in progress; follow marshaller for docking.

2025-07-28 13:15 - 2025-10-15 06:00

Period of Applicability

2025-07-28 13:15 - 2025-10-15 06:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

The Visual Docking Guidance System (VDGS) is unavailable at multiple bays due to work in progress, and aircraft docking at these bays must follow the marshaller.

Message

VISUAL DCKG GUIDANCE SYSTEM (VDGS) AT BAY NR 51,52,53,54,55,55L,55R,56,56L,56R,57,57R,57L,58,58R,58L,59,59L,59R, 60,60L,60R,61,61L AND 61R NOT AVBL DUE WIP. RMK:ACFT DCKG INTO BAY NR 51,52,53,54,55,55L,55R,56,56L,56R,57,57R,57L,58,58R,58L,59,59L,59R, 60,60L,60R,61,61L AND 61R SHALL FLW MARSHALLER.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A1351/25 NOTAMR A0907/25
Q) VECF/QFDXX/I/M/A/000/999/2238N08826E025
A) VECC B) 2507281315 C) 2510150600
E) VISUAL DCKG GUIDANCE SYSTEM (VDGS) AT BAY NR 
51,52,53,54,55,55L,55R,56,56L,56R,57,57R,57L,58,58R,58L,59,59L,59R, 
60,60L,60R,61,61L AND 61R NOT AVBL DUE WIP.
RMK:ACFT DCKG INTO BAY NR 
51,52,53,54,55,55L,55R,56,56L,56R,57,57R,57L,58,58R,58L,59,59L,59R, 
60,60L,60R,61,61L AND 61R SHALL FLW MARSHALLER.
Issued 21 days ago
Was this helpful?