A0907/25
Checking status...
Unknown Category

VDGS at multiple bays is unavailable due to work in progress.

2025-05-22 08:30 - 2025-07-31 18:29

Period of Applicability

2025-05-22 08:30 - 2025-07-31 18:29

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

The Visual Docking Guidance System (VDGS) at bays 51 through 61 is not available due to work in progress. Aircraft docking into these bays may be affected.

Message

VISUAL DCKG GUIDANCE SYSTEM (VDGS) AT BAY NR 51,52,53,54,55,55L,55R,56,56L,56R,57,57R,57L,58,58R,58L,59,59L,59R, 60,60L,60R,61,61L AND 61R NOT AVBL DUE WIP. RMK:ACFT DCKG INTO BAY NR 51,52,53,54,55...

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A0907/25 NOTAMN
Q) VECF/QFDXX/I/M/A/000/999/2238N08826E025
A) VECC B) 2505220830 C) 2507311829
E) VISUAL DCKG GUIDANCE SYSTEM (VDGS) AT BAY NR 
51,52,53,54,55,55L,55R,56,56L,56R,57,57R,57L,58,58R,58L,59,59L,59R, 
60,60L,60R,61,61L AND 61R NOT AVBL DUE WIP.
RMK:ACFT DCKG INTO BAY NR 
51,52,53,54,55,55L,55R,56,56L,56R,57,57R,57L,58,58R,58L,59,59L,59R, 
60,60L,60R,61,61L AND 61R SHALL FLW MARSHALLER.
Issued at: 2025-05-21 12:46
Was this helpful?