A0812/25
Checking status...
Runway Operations

Runway 19L/01R is not available due to maintenance work.

2025-05-08 05:30 - 2025-05-30 10:30

Period of Applicability

2025-05-08 05:30 - 2025-05-30 10:30

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

Runway 19L/01R is not available for operations due to maintenance work in progress when visibility is 1200m and above. Taxiway L and the junction of runway 01R with taxiway C are available for operations. The western strip of runway 19R/01L between taxiways B and C is available up to non-standard conditions. The work is scheduled from Tuesday to Friday, 0530 to 1030.

Message

RWY 19L/01R NOT AVBL FOR OPS DUE MAINT. WIP WHEN VIS 1200M AND ABV. RMK: 1. TWY L AND JUNCTION OF RWY 01R WITH TWY C AVBL FOR OPS. 2. WESTERN STRIP OF RWY 19R/01L BTN TWY B AND TWY C AVBL UPTO NON S...

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A0812/25 NOTAMN
Q) VECF/QMRLC/IV/NBO/A/000/999/2239N08827E005
A) VECC B) 2505080530 C) 2505301030
D) TUE WED THU FRI 0530-1030
E) RWY 19L/01R NOT AVBL FOR OPS DUE MAINT. WIP WHEN VIS 1200M AND 
ABV.
RMK:
1. TWY L AND JUNCTION OF RWY 01R WITH TWY C AVBL FOR OPS.
2. WESTERN STRIP OF RWY 19R/01L BTN TWY B AND TWY C AVBL UPTO NON 
STD WID 50M FM RCL DUE DRAIN RECONSTRUCTION.
IN CASE OF URGENT RQMNTS 01 HR PN FOR AVBL OF RWY 19L/01R. PILOTS TO 
EXER CTN DUE MEN AND MATERIAL CONFINED TO WORKSITE.
Issued at: 2025-05-07 08:16