A2244/25
Checking status...
Runway Operations

Arrivals and departures likely to be delayed at the aerodrome due to an operational requirement.

2025-09-15 05:30 - 2025-09-23 07:30

Period of Applicability

2025-09-15 05:30 - 2025-09-23 07:30

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

Arrivals and departures are likely to be delayed due to an operational requirement. Expected daily delay period 0530-0730 (local). The NOTAM also includes system/transaction messages (sequence check for VIDPYNYX, duplicate NOTAM, transaction rolled back) which appear administrative and do not alter the operational impact.

Message

ARR/DEP LIKELY TO BE DELAYED DUE OPR REQUIREMENT. CNS123W SEQUENCE CHECK FOR VIDPYNYX A -- EXPECTED A2245/25 -- RECEIVED A2244/25 CNN038W DUPLICATE NOTAM TRANSACTION ROLLED BACK, RETCODE = 14

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

Q) VIDF/QFAXX/IV/BO/A/000/999/3040N07647E005
A) VICG B) 2509150530 C) 2509230730
D) DLY 0530-0730
E) ARR/DEP LIKELY TO BE DELAYED DUE OPR REQUIREMENT.


CNS123W SEQUENCE CHECK FOR VIDPYNYX A -- 
EXPECTED A2245/25 -- RECEIVED A2244/25
CNN038W DUPLICATE NOTAM
TRANSACTION ROLLED BACK, RETCODE = 14
Issued 3 days ago
Was this helpful?