A1795/25
Checking status...
Runway Operations

Construction and repair work near the runway requires pilots to exercise caution during landing and takeoff.

2025-08-01 07:30 - 2025-08-31 18:30

Period of Applicability

2025-08-01 07:30 - 2025-08-31 18:30

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

Construction and repair work is taking place on the north and south sides of the runway, 105 meters from the runway centerline. The height of the machinery is a maximum of 5 meters. Pilots are advised to exercise caution during landing and takeoff.

Message

NEW DRAIN CONST, REPAIR AND AGL (AERONAUTICAL GND LGT) CABLING WORK ON NORTH AND SOUTH OF RWY AT A DIST OF 105M FM RCL. HGT OF MACHINERY 5M (MAX). PILOT EXER CTN DURING LDG/ TKOF.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A1795/25 NOTAMR A1760/25
Q) VIDF/QMRHW/IV/NBO/A/000/999/2649N07548E005
A) VIJP B) 2508010730 C) 2508311830
E) NEW DRAIN CONST, REPAIR AND AGL (AERONAUTICAL GND LGT) CABLING
WORK
ON NORTH AND SOUTH OF RWY AT A DIST OF 105M FM RCL. HGT OF MACHINERY
5M (MAX). PILOT EXER CTN DURING LDG/ TKOF.
Issued 18 days ago
Was this helpful?