ILS procedures for RWY 27 at Lucknow Airport updated for simultaneous aircraft operations.
2024-10-17 08:40 - PERM
Period of Applicability
2024-10-17 08:40 - PERM
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, cancel anytime
Interpretation
The ILS procedures for RWY 27 at Lucknow Airport have been updated to include simultaneous aircraft operations at the same level at LKN Hold and Racetrac, as per the AIP dated 02 Nov 2023.
Message
REF AIP AD 2 VILK 2-103 DATED 02 NOV 2023 REGARDING ILS (CAT II / CAT IIIA / IIIB) RWY 27 PROC - LUCKNOW AP. INSERT FLW NOTE IN THE PLAN VIEW SIMULTANEOUS ACFT OPS AT SAME LVL AT LKN HOLD AND RACETRAC...
Map Visualization
Loading map data
Please wait...
© OpenStreetMap contributors
Raw NOTAM
Issued at: 2024-10-17 08:43
Was this helpful?