G1207/24
Checking status...
Approach Procedures

Insert note for simultaneous aircraft operations at LKN holding and racetrack procedure at Bokor.

2024-10-17 08:35 - PERM

Period of Applicability

2024-10-17 08:35 - PERM

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

A note regarding simultaneous aircraft operations at the same level at Lucknow Airport (LKN) holding and racetrack procedure at Bokor is to be inserted in the plan view, as referenced in AIP AD 2 VILK 2-101 dated 02 November 2023.

Message

REF AIP AD 2 VILK 2-101 DATED 02 NOV 2023 REGARDING ILS (CAT-1) RWY 27 PROC - LUCKNOW AP. INSERT FLW NOTE IN THE PLAN VIEW SIMULTANEOUS ACFT OPS AT SAME LVL AT LKN HOLD AND RACETRACK PROC AT BOKOR IS ...

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

G1207/24 NOTAMN
Q) VIDF/QPICH/I/NBO/A/000/999/2646N08053E005
A) VILK B) 2410170835 C) PERM
E) REF AIP AD 2 VILK 2-101 DATED 02 NOV 2023 REGARDING ILS (CAT-1)
RWY 27 PROC - LUCKNOW AP.
INSERT FLW NOTE IN THE PLAN VIEW
SIMULTANEOUS ACFT OPS AT SAME LVL AT LKN HOLD AND RACETRACK PROC AT
BOKOR IS NOT PERMITTED.
AMEND THE CHART ACCORDINGLY.
Issued at: 2024-10-17 08:41
Was this helpful?