ILS for Runway 27 temporarily withdrawn due to construction activities.
2025-05-30 05:50 - 2025-07-10 12:30
Period of Applicability
2025-05-30 05:50 - 2025-07-10 12:30
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, cancel anytime
Interpretation
The ILS for Runway 27 is temporarily withdrawn due to construction activities involving the NAVAIDs duct, airside drainage, and the construction of a parallel taxi track with a link taxiway.
Message
ILS RWY 27 (LOC ILUC 109.900MHZ, GP 333.800MHZ/DME ILUC CH36X) TEMPORARILY WITHDRAWN DUE CONST OF NAVAIDS DUCT, AIRSIDE DRAIN AND CONST OF PARL TAXI TR (PTT) WITH LINK TWY.
Map Visualization
Loading map data
Please wait...
© OpenStreetMap contributors
Raw NOTAM
Issued at: 2025-05-30 05:53
Was this helpful?