G0124/25
Checking status...
Approach Procedures

ILS RWY 27R procedure withdrawn temporarily due to equipment replacement.

2025-02-03 09:19 - 2025-05-03 23:59

Period of Applicability

2025-02-03 09:19 - 2025-05-03 23:59

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

The ILS procedure for runway 27R at Bengaluru (VOBL) has been temporarily withdrawn due to equipment replacement as of 08 September 2022.

Message

REF EAIP PAGE AD 2 VOBL 2-107 DATED 08 SEP 2022 REGARDING ILS RWY 27R PROC OF BENGALURU (VOBL) AP. ILS RWY 27R PROC WITHDRAWN TEMPO DUE EQPT REPLACEMENT. CNS123W SEQUENCE CHECK FOR VIDPYNYX G -- ...

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

G0124/25 NOTAMR G1311/24
Q) VOMF/QPIAW/I/NBO/A/000/999/1312N07742E005
A) VOBL B) 2502030919 C) 2505032359 EST
E) REF EAIP PAGE AD 2 VOBL 2-107 DATED 08 SEP 2022 REGARDING ILS RWY
27R PROC OF BENGALURU (VOBL) AP. ILS RWY 27R PROC WITHDRAWN TEMPO
DUE EQPT REPLACEMENT.


CNS123W SEQUENCE CHECK FOR VIDPYNYX G -- 
  EXPECTED G0125/25 -- RECEIVED G0124/25
CNN038W DUPLICATE NOTAM
TRANSACTION ROLLED BACK, RETCODE = 14
Issued at: 2025-02-03 09:21
Was this helpful?