A1863/25
Checking status...
Airport Maintenance

Preventive maintenance work on aeronautical ground lighting near runways 09R/27L and 09L/27R; personnel and materials present.

2025-06-19 03:30 - 2025-09-18 12:30

Period of Applicability

2025-06-19 03:30 - 2025-09-18 12:30

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

Preventive maintenance work in progress on aeronautical ground lighting on both sides of runways 09R/27L and 09L/27R shoulders at a distance of 80 meters from the runway centerline. Personnel and materials will be present up to a height of 4 meters during the specified times.

Message

PREVENTIVE MAINT OF AERONAUTICAL GND LGT WIP ON BOTH SIDES OF RWY09R/27L AND RWY09L/27R SHOULDERS AT A DIST OF 80M RCL. MEN AND MATERIALS UPTO HGT OF 4M WILL BE AVBL.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A1863/25 NOTAMN
Q) VOMF/QMRXX/IV/BO/A/000/999/1312N07742E005
A) VOBL B) 2506190330 C) 2509181230
D) 0330-1230
E) PREVENTIVE MAINT OF AERONAUTICAL GND LGT WIP ON BOTH SIDES OF
RWY09R/27L AND RWY09L/27R SHOULDERS AT A DIST OF 80M RCL.
MEN AND MATERIALS UPTO HGT OF 4M WILL BE AVBL.
Issued at: 2025-06-19 01:15
Was this helpful?